Foundation

Over the last week, our Bridgeland House has had it's foundation poured. The following shots show the formwork in place, the pumper truck pouring the foundation, the stripped foundation, and the main floor plate almost complete. Thanks to Gary Campbell for the photos!

Cribbing in progress.

Pumping concrete into the foundation wall cribbing.

The formwork is stripped and loaded, ready to be craned away.

 

The floor plate is almost complete.