The Brideland House was getting ready for interior painting last week. The windows were masked, the flooring was covered, and the heaters were running. Those oriented strand board sheets aren't part of the look; those are temporary guards standing in for the glass ones that will be installed later. The glass guards will be set into the aluminum shoe that you see in these pictures, and that shoe will be clad in black metal to match the stringers. A black handrail will be affixed to directly to the glass. (Those spruce steps are temporary as well!)
The exterior is also being worked on this week: black Longboard is being installed. We'll get some pictures posted here as soon as we can get them.